Cement optimisation
Introduction
Engineering and Cementing Design Practices
Normal design practices involve the preparation of a draft cementing programme by the
Onshore cementing engineering personnel, once the finalised drilling programme is
available.
A typical cementing programme would include:
·  recommended slurries,
·  spacer compositions,
·  and placement procedures.
·  Setting and strengthening times.
Preliminary designs are based on general good oil field practices and experience of
those operating in similar well/down-hole situations and circumstances.
As drilling progresses the slurry design and placement technique must then be further
optimised and tailored to meet the actual well conditions to achieve cementing
requirements. Special reference would be made to design aspects such as to BHST,
hole caliper, mud and formation properties, lost circulation, over pressurised zones,
permeable or salt formations etc.
Computerised simulations are then performed. Normal practices verifying that the
cement slurry properties to be used will meet necessary requirements and if not would
then be adjusted by laboratory testing using location samples of cement, additives and
mixing water. This testing would be completed in the cementing companies laboratory.

optimising cementing--优化固井英语资料.rar

44 KB, 下载次数: 6

1145

主题

10万

铜板

2

好友

传奇会员

Rank: 30Rank: 30Rank: 30Rank: 30Rank: 30Rank: 30Rank: 30Rank: 30

积分
21808

灌水勋章活跃勋章冰雪节勋章

QQ
发表于 2013-11-16 10:53 | 显示全部楼层
进来看看了

评分

参与人数 1铜板 +1 收起 理由
admin + 1 亲,你好快哦~~~

查看全部评分

加强科技支撑和引领  实现地质找矿新突破 。     
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

在线客服
快速回复 返回顶部 返回列表