﻿K25+859.964,左侧,2933244.496,510371.208,2008.127,1976.873,1×8+2×8+7.254=31.254,19.98,1:0.30/1:0.40
K25+859.964,左侧,2933244.496,510371.208,2008.127,1976.873,1×8+2×8+7.254=31.254,19.98,1:0.30/1:0.40
K25+859.964,左侧,2933244.496,510371.208,2008.127,1976.873,1×8+2×8+7.254=31.254,19.98,1:0.30/1:0.40
K25+859.964,左侧,2933244.496,510371.208,2008.127,1976.873,2×8+1×8+7.254=31.254,19.18,1:0.30/1:0.40

测设时间：202010-9-1 17:23:44(会攀公路)
测量项目：雨污水管道开挖放样
测站,K27-1,10497.998,24653.075,447.636
定向,K27-2,10316.510,24731.964,445.731
方位角156.3023,距离197.892,仪高1,视线高448.636
桩号,方向,X,Y,H,路面高,高差,宽度,坡比
K25+859.964,左侧,2933244.496,510371.208,2008.127,1976.873,2×8+1×8+7.254=31.254,19.18,1:0.30/1:0.40